---
product_id: 70054971
title: "Intermatic Motor Long Leads Old Style 220V WG433-20D"
brand: "intermatic"
price: "£88.51"
currency: GBP
in_stock: true
reviews_count: 2
url: https://www.desertcart.co.uk/products/70054971-intermatic-motor-long-leads-old-style-220v-wg433-20d
store_origin: GB
region: United Kingdom
---

# Intermatic Motor Long Leads Old Style 220V WG433-20D

**Brand:** intermatic
**Price:** £88.51
**Availability:** ✅ In Stock

## Quick Answers

- **What is this?** Intermatic Motor Long Leads Old Style 220V WG433-20D by intermatic
- **How much does it cost?** £88.51 with free shipping
- **Is it available?** Yes, in stock and ready to ship
- **Where can I buy it?** [www.desertcart.co.uk](https://www.desertcart.co.uk/products/70054971-intermatic-motor-long-leads-old-style-220v-wg433-20d)

## Best For

- intermatic enthusiasts

## Why This Product

- Trusted intermatic brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Description

208/277 V At 60 Hz; Used On At1300R Series Time Switch; Intermatic[R] Brand; Wg433-20D Model

## Technical Specifications

| Specification | Value |
|---------------|-------|
| Brand | Intermatic |
| Item model number | WG433-20D |
| Item Weight | 3.2 ounces |
| Product Dimensions | 3.3 x 2.3 x 1.5 inches |
| Item Dimensions  LxWxH | 3.3 x 2.3 x 1.5 inches |
| Manufacturer | Intermatic, Inc |
| ASIN | B00PSN4N70 |
| Date First Available | November 18, 2014 |

## Product Details

- **Brand:** Intermatic
- **Speed:** 100
- **Item Weight:** 0.2 Pounds
- **Manufacturer:** Intermatic, Inc
- **UPC:** 078275020108

## Images

![Intermatic Motor Long Leads Old Style 220V WG433-20D - Image 1](https://m.media-amazon.com/images/I/51DWmYiaUWL.jpg)

## Customer Reviews

### ⭐ Did not issue refund for defective item after return to Webb Electric Supply
*by G***. on July 9, 2020*

The product delivered was installed and did not work. It was removed and upon very close inspection saw that one of the wires was not on the terminal. The proper return policy was followed and I am now told that this is not what they shipped. When I found this item was defective I contacted Webb Electric Supply and sent the attached picture asking about their exchange/refund policy. I was instructed to follow the Amazon process which I did.I received an email last night that the item I sent them is not the item they delivered to me. Coincidently I just received the replacement timer I ordered from Webb and hope this one works.The only issue that Webb Electric supply could have is that the first (defective) timmer they sent to me did not have any "Intermatic" (the manufacturer) markings on the case of the timer, only on the box it was packaged in so I wrote that information by hand on the case with a marker for future reference in case another replacement was required. Interesting enough that the new replacement has the markings that the first defective item did not!!At this point I am not happy with my experience with Webb Electric Supply.

### ⭐⭐⭐⭐⭐ Five Stars
*by M***S on October 26, 2017*

Very good timers

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.co.uk/products/70054971-intermatic-motor-long-leads-old-style-220v-wg433-20d](https://www.desertcart.co.uk/products/70054971-intermatic-motor-long-leads-old-style-220v-wg433-20d)

---

*Product available on Desertcart United Kingdom*
*Store origin: GB*
*Last updated: 2026-11-15*