---
product_id: 407625215
title: "15M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated"
brand: "true hq"
price: "£16.78"
currency: GBP
in_stock: false
category: "True Hq"
url: https://www.desertcart.co.uk/products/407625215-15m-hdmi-cable-high-speed-long-lead-with-ethernet-arc
store_origin: GB
region: United Kingdom
---

# 18 Gbps high-speed data transfer 15-meter ultra-long reach 24K gold-plated connectors 15M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated

**Brand:** true hq
**Price:** £16.78
**Availability:** ❌ Out of Stock

## Summary

> 🎮 Connect Like a Pro — Long, Fast, and Flawlessly Gold-Plated!

## Quick Answers

- **What is this?** 15M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated by true hq
- **How much does it cost?** £16.78 with free shipping
- **Is it available?** Currently out of stock
- **Where can I buy it?** [www.desertcart.co.uk](https://www.desertcart.co.uk/products/407625215-15m-hdmi-cable-high-speed-long-lead-with-ethernet-arc)

## Best For

- true hq enthusiasts

## Why This Product

- Trusted true hq brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Key Features

- • **Versatile Compatibility:** Works perfectly with PS4, Xbox One, Sky HD, laptops, monitors, and CCTV systems (up to 1080p).
- • **Blazing Fast 18Gbps Speed:** Supports Full HD 1080p at 60Hz with zero lag for gaming, streaming, and professional use.
- • **Flawless Signal Integrity:** 24K gold-plated connectors and triple shielding ensure crisp, interference-free transmission.
- • **Extend Your Setup Seamlessly:** 15 meters of premium cable length to connect distant devices without signal loss.
- • **Built to Last with Confidence:** Durable PVC jacket, designed in the UK, and backed by a 3-year warranty for peace of mind.

## Overview

This 15-meter True HQ HDMI cable delivers high-speed 18Gbps data transfer with 24K gold-plated connectors and triple shielding for interference-free Full HD 1080p video and immersive audio. Designed in the UK, it supports Ethernet, ARC, and 3D, making it ideal for gaming consoles, HDTVs, laptops, and CCTV setups. Built with durable PVC and backed by a 3-year warranty, it ensures reliable, long-distance connectivity for professional and home entertainment environments.

## Description

15M HDMI Cable v1.4 by True HQ™ | HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated

## Features

- [15 METER HDMI CABLE] - 50FT High-Speed HDMI to HDMI Long Lead with Ethernet and ARC (Audio Return Channel). Finished with 24K gold plated connectors for flawless and crisp signal transmission. Our award winning HDMI cables are designed in the UK.
- [QUALITY MATERIALS] - Our HDMI cables are made to the highest standards. Featuring copper cable and double shielding to ensure smooth data transmission with no interference. Our long cables are ideal for extending your HDMI signal to other areas of the home or workplace. With a durable PVC jacket for easy routing in challenging areas.
- [WIDE COMPATIBILITY] – These cables are compatible with a range of devices that support HDMI. A perfect match for CCTV, Freeview/Freesat and Sky HD TV, PS4 & Xbox One Gaming Consoles, Blu-Ray & DVD Players, Home Cinema, AV Receivers, PC, Laptops, HDTV, Projectors. They are not compatible with Sky Q, PS4 Pro, Xbox One X and 4K Blu Ray Players when the resolution in set higher than 1080p.
- [HIGH SPECIFICATION] – Packed with high specifications including Ethernet, CEC, 3D and ARC (Audio Return Channel) Support. Immersive HD surround sound audio including 5.1 & 7.1 Dolby Atmos and DTS X audio. High Resolutions from 720p, 1080i and 1080p at 60Hz. No picture degradation at longer lengths
- [PREMIUM SERVICE] - Our cables have a 3-year extended warranty as standard and are individually inspected straight on the assembly line. We pride ourselves in providing high quality items and outstanding customer service.

## Technical Specifications

| Specification | Value |
|---------------|-------|
| ASIN | B07TK44BL7 |
| Best Sellers Rank | #16,704 in Electronics ( See Top 100 in Electronics ) #187 in HDMI Cables |
| Brand Name | True HQ |
| Cable Type | HDMI |
| Color | Black |
| Compatible Devices | PS3, PS4, Xbox One, TVs, Projector, A/V Receivers, CCTV, Laptops, Monitors, PCs, Notebooks, Nvidia Shield, Apple TV, Amazon Fire TV, Sky HD, Sky Q (1080p), TiVo box, DVD & Blu-Ray Players and any device with an HDMI port. |
| Compatible Phone Models | Not Compatible Phone Models |
| Connectivity Technology | HDMI |
| Connector Gender | Male |
| Connector Type | HDMI |
| Customer Package Type | standard package |
| Customer Reviews | 4.3 4.3 out of 5 stars (2,010) |
| Data Transfer Rate | 18 Gigabytes Per Second |
| Ethernet Cable Category | Cat 5e |
| Frequency | 60 Hz |
| Included Components | 1 |
| Indoor Outdoor Usage | Indoor |
| Item Length | 15 Meters |
| Item Shape | Round |
| Manufacturer | True HQ |
| Model | TRUEHQ-HDMI-15M |
| Model Name | TRUEHQ-HDMI-15M |
| Number of Items | 1 |
| Number of Pins | 19 |
| Other Special Features of the Product | Designed in the UK, Gold Plated Connectors, High Speed, Triple Shielding |
| Outer Material | Polyvinyl Chloride (PVC) |
| Part Number | TRUEHQ-HDMI-15M |
| Recommended Uses For Product | Computer, Laptop |
| Specification Met | CE |
| Unit Count | 1 Count |

## Product Details

- **Brand:** True HQ
- **Cable type:** HDMI
- **Connector type:** HDMI
- **Special features:** Designed in the UK, Gold Plated Connectors, High Speed, Triple Shielding

## Images

![15M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated - Image 1](https://m.media-amazon.com/images/I/71GEW9SqrjL.jpg)

## Available Options

This product comes in different **Color, Size** options.

## Frequently Bought Together

- True HQ 15M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK | Full HD 1080P Compatible with PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated
- MT-VIKI 4K HDMI Splitter 1 in 4 Out Simultaneously 4 Monitors Mirror HDMI Splitter 1x4 Supports 4K HD Monitors HDCP1.4 with DC Power Supply 30 m Long Distance Transmission

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.co.uk/products/407625215-15m-hdmi-cable-high-speed-long-lead-with-ethernet-arc](https://www.desertcart.co.uk/products/407625215-15m-hdmi-cable-high-speed-long-lead-with-ethernet-arc)

---

*Product available on Desertcart United Kingdom*
*Store origin: GB*
*Last updated: 2026-11-10*